Friday, March 30, 2012

Post Five:

Today since i worked my first 7 - 3 i felt like i got more done then usual . This morning when i came in . .

  • I finished the dime outs from 3/29 that i said ill finish . There were much more dime outs on those shelves then the other ones . 
  • I boxed the dime outs and left them in back stock , the boxes labeled "dime outs" .
  • From there i joined Seth with putting out the rest of the shipment . I back stocked the rest of the cargo, and snap backs .
  • I hung the BDG tank tops on the wall behind the denims and hung the koto tanks on the opposite wall . 
  • There were new Knicks graphic tee's which i folded half of (Seth folded the other half) and put onto the graphic table. 
  • There were a few Levi 511 the green and the light light blue denim put out on the floor. 
  • I moved around a few shirts to make room for a few of the new shirts and tanks 
  • I was putting out more graphic when i had to leave but Elle probably finished putting them out .
    • Basics: Maintain | Ran for sizes | Ran sale .
-Savion

No comments:

Post a Comment